Hyde Park SWM Works Assignment ‘B’ – Detailed Design
About this project
The City of London and Matrix Solutions (Ecosystems Recovery Inc.) are starting the detailed design and tender preparation of various identified works in the Hyde Park EA Addendum (AECOM, 2020). Project location and project work details are listed below.
Since the completion of the 2002 Class EA, the area and regulatory environment has evolved which caused the City to restudy and publish an EA Addendum in 2018. This evolution included changes to development plans and patterns, increased prominence and emphasis on Low Impact Development, increased emphasis on permanent private systems as well as climate change considerations.
This assignment looks to implement several key projects identified in the EA Addendum. Specifically, this assignment will involve the detailed design and tender preparation of the following projects:
- Retrofit Outlet Structure for Hyde Park SWMF 3E.
- Retrofit Hyde Park SWMF #4 with habitat enhancements.
- Investigations of Existing Cantebury Estates SWM Facility.
- 70 +/- metres of Stanton Drain natural channel Remediation (110 +/- metres following the centerline of the channel); and