About this project
Construction work is underway to replace and repair aging infrastructure at Springbank Reservoirs 1 and 3 that has exceeded its expected lifecycle.
This project includes:
Stripping of the topsoil from the top of the reservoirs to access the roof membranes
Hauling and stockpiling of the soil on the vacant City of London lands south of the community gardens
Replacement of the roof membrane for Reservoir 1 and 3
Structural repairs to the interior of the reservoir
Repairs to the stairs on Reservoir 3
Soil Layer is restored to reservoir roof tops
Restoration of work areas
Tree removals
Work is to be carried out into two phases with Reservoir 1 work being completed first followed by Reservoir 3. Construction of Phase 1 was completed in 2022, followed by Phase 2, which will be completed approximately by fall 2024.
Above: The map above shows the project location. Work will be on Reservoir 1 located north of Commissioners Road and Reservoir 3 located south of Commissioners Road. The area located south of the community gardens will be used as a storage staging and storage area for both projects.
Ongoing public engagement
The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentation."
It's also possible to access the PowerPoint presentation used during the PUM on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides."
You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting:
Project Lead
Name: Dave Chromczak Organization: City of London Phone: 519-661-2489 x 8439 E-mail: dchromcz@london.ca
About this project
Construction work is underway to replace and repair aging infrastructure at Springbank Reservoirs 1 and 3 that has exceeded its expected lifecycle.
This project includes:
Stripping of the topsoil from the top of the reservoirs to access the roof membranes
Hauling and stockpiling of the soil on the vacant City of London lands south of the community gardens
Replacement of the roof membrane for Reservoir 1 and 3
Structural repairs to the interior of the reservoir
Repairs to the stairs on Reservoir 3
Soil Layer is restored to reservoir roof tops
Restoration of work areas
Tree removals
Work is to be carried out into two phases with Reservoir 1 work being completed first followed by Reservoir 3. Construction of Phase 1 was completed in 2022, followed by Phase 2, which will be completed approximately by fall 2024.
Above: The map above shows the project location. Work will be on Reservoir 1 located north of Commissioners Road and Reservoir 3 located south of Commissioners Road. The area located south of the community gardens will be used as a storage staging and storage area for both projects.
Ongoing public engagement
The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentation."
It's also possible to access the PowerPoint presentation used during the PUM on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides."
You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting: