About this project
The City will be reconstructing Southcrest Drive from Beachwood Avenue to Gardenwood Drive to replace aging infrastructure that has exceeded its expected lifecycle. The work will include replacing the existing watermain from Wanasea Avenue to Gardenwood Drive. Construction is expected to start in summer 2021 and anticipated to be completed by winter 2021 with some minor surface asphalt work in spring 2022.
Existing sidewalks on Southcrest Drive will be replaced. At this time there are no plans to install new sidewalk on the south side of Southcrest Drive from the existing sidewalk to Beachwood Avenue.
This spring, you will see City staff in this area marking trees that are planned to be removed due to poor health or construction related issues.
Proposed work details
Full road will be removed and reconstructed
Watermain would be replaced
Water services would be replaced
New curb and gutters would be constructed
Sidewalks would be repaired
New asphalt
Some trees would require removal where required, and would later be replaced. New trees would be planted the following year by the City.
The project will consist of a full road closure with local traffic access only. Access to local businesses and residential properties will be maintained with a few possible disruptions at different stages in the project. A hard surface will be maintained to allow for sidewalk access to the best extent possible. Signage will be posted at either end of the work site to alert pedestrians if the sidewalk is closed. Cyclist should exercise caution around the site and follow all construction signs. London Transit (LTC) detours will be in effect during construction and bus stop closures will also be in place.
Residents who require accessibility accommodations are encouraged to contact the City Project Manager to arrange access during construction.
Tree impacts
One tree would need to be removed at each of the following locations as part of this project:
229 Southcrest Drive
233 Southcrest Drive
251 Southcrest Drive
259 Southcrest Drive
264 Southcrest Drive (located on side boulevard on Wanasea Avenue, and being removed due to poor health)
264 Southcrest Drive
271 Southcrest Drive
275 Southcrest Drive
279 Southcrest Drive
280 Southcrest Drive
303 Southcrest Drive
309/311 Southcrest Drive
318 Southcrest Drive
324 Southcrest Drive
332 Southcrest Drive
New trees would be planted the following year by the City. For more information about trees and potential impacts, please contact the Project Manager.
Above: The above map shows the project limits. The City of London will reconstruct Southcrest Drive.
You can leave any questions or comments below. Please don't hesitate to contact the Project Manager if you have any questions or would like to request information in an alternate format.
About this project
The City will be reconstructing Southcrest Drive from Beachwood Avenue to Gardenwood Drive to replace aging infrastructure that has exceeded its expected lifecycle. The work will include replacing the existing watermain from Wanasea Avenue to Gardenwood Drive. Construction is expected to start in summer 2021 and anticipated to be completed by winter 2021 with some minor surface asphalt work in spring 2022.
Existing sidewalks on Southcrest Drive will be replaced. At this time there are no plans to install new sidewalk on the south side of Southcrest Drive from the existing sidewalk to Beachwood Avenue.
This spring, you will see City staff in this area marking trees that are planned to be removed due to poor health or construction related issues.
Proposed work details
Full road will be removed and reconstructed
Watermain would be replaced
Water services would be replaced
New curb and gutters would be constructed
Sidewalks would be repaired
New asphalt
Some trees would require removal where required, and would later be replaced. New trees would be planted the following year by the City.
The project will consist of a full road closure with local traffic access only. Access to local businesses and residential properties will be maintained with a few possible disruptions at different stages in the project. A hard surface will be maintained to allow for sidewalk access to the best extent possible. Signage will be posted at either end of the work site to alert pedestrians if the sidewalk is closed. Cyclist should exercise caution around the site and follow all construction signs. London Transit (LTC) detours will be in effect during construction and bus stop closures will also be in place.
Residents who require accessibility accommodations are encouraged to contact the City Project Manager to arrange access during construction.
Tree impacts
One tree would need to be removed at each of the following locations as part of this project:
229 Southcrest Drive
233 Southcrest Drive
251 Southcrest Drive
259 Southcrest Drive
264 Southcrest Drive (located on side boulevard on Wanasea Avenue, and being removed due to poor health)
264 Southcrest Drive
271 Southcrest Drive
275 Southcrest Drive
279 Southcrest Drive
280 Southcrest Drive
303 Southcrest Drive
309/311 Southcrest Drive
318 Southcrest Drive
324 Southcrest Drive
332 Southcrest Drive
New trees would be planted the following year by the City. For more information about trees and potential impacts, please contact the Project Manager.
Above: The above map shows the project limits. The City of London will reconstruct Southcrest Drive.
You can leave any questions or comments below. Please don't hesitate to contact the Project Manager if you have any questions or would like to request information in an alternate format.
The personal information submitted on this page is collected under the authority of the Municipal Act, 2001, S.O. 2001, c. 25 and will be used to provide details regarding future construction communications.
Questions about this collection should be addressed to the project managers at 300 Dufferin Ave., London, ON N6A 4L9, or by telephone at 519-661-2489 ext. 4733, or email to shaynes@london.ca
Narrated Presentation
Click here to play video
Southcrest Drive Reconstruction: Narrated Project Update Meeting (PUM)