About the project:
The City of London is planning to reconstruct Rectory Street in 2025 to replace aging underground infrastructure that has exceeded its expected lifecycle.
The work includes:
Removing the current road surface, curbs and gutters
Replacing watermain, sanitary sewer, and storm sewer
Renewing private drain connections and water services
Adding new granular sub-layer, base granular, and asphalt
Adding new curbs, catchbasins, and gutters
Boulevard restoration (adding new topsoil and sod)
New cycling infrastructure
Tree removals
Public Update Meeting:
The City of London hosted a public update meeting on Wednesday, November 20, 2024 at BMO Centre, to provide an update on the project and share information on construction. Below is a copy of the materials presented.
Above: The map identifies the approximate limits of the construction project area. Work is planned for Rectory Street from Little Simcoe Street to Florence Street.
About the project:
The City of London is planning to reconstruct Rectory Street in 2025 to replace aging underground infrastructure that has exceeded its expected lifecycle.
The work includes:
Removing the current road surface, curbs and gutters
Replacing watermain, sanitary sewer, and storm sewer
Renewing private drain connections and water services
Adding new granular sub-layer, base granular, and asphalt
Adding new curbs, catchbasins, and gutters
Boulevard restoration (adding new topsoil and sod)
New cycling infrastructure
Tree removals
Public Update Meeting:
The City of London hosted a public update meeting on Wednesday, November 20, 2024 at BMO Centre, to provide an update on the project and share information on construction. Below is a copy of the materials presented.
Above: The map identifies the approximate limits of the construction project area. Work is planned for Rectory Street from Little Simcoe Street to Florence Street.
Share Ask a question or share a comment on FacebookShare Ask a question or share a comment on TwitterShare Ask a question or share a comment on LinkedinEmail Ask a question or share a comment link
Rectory Street Infrastructure Renewal Project is currently at this stage
Detailed design is completed, incorporating comments and input from residents where possible.
Winter 2025
this is an upcoming stage for Rectory Street Infrastructure Renewal Project
Tree assessment is completed and any trees requiring removal are identified. Residents receive notification with details of final street design and any information on tree impacts
March 31, 2025
this is an upcoming stage for Rectory Street Infrastructure Renewal Project
Any tree removals required are completed by this date, in accordance with legislation protecting migratory birds and their nesting periods.
Spring/Summer 2025
this is an upcoming stage for Rectory Street Infrastructure Renewal Project
Residents will receive a notice in the mail approximately two weeks ahead of the start of construction, with more detailed information on temporary conditions and impacts to things like street parking and access, and garbage collection.
The personal information submitted on this page is collected under the authority of the Municipal Act, 2001, S.O. 2001, c. 25 and will be used to provide details regarding the Rectory infrastructure renewal project.
Questions about this collection of personal information should be addressed to Kathleen Johnson, P.Eng. at 300 Dufferin Ave., London, ON N6A 4L9, or by telephone at 519-661-2489 ext. 5236 , or email to kajohnso@london.ca