Paul Street Infrastructure Renewal Project
Engagement opportunity
The City of London is hosting a public update meeting on Tuesday, December 9, 2025, to provide an update on the project and share information on construction.
Please join the City of London for a drop-in event to view construction plans, review necessary tree removals, discuss impacts to your property, and learn more about the project. Following the meeting, the project boards displayed at the meeting will be available for download on the project website listed below.
Date: Tuesday, December 9
Time: 5:00 to 7:00 p.m.
Location: Kinsmen Recreation Centre, 20 Granville Street
About the project:
The City of London is planning to reconstruct Paul Street in your area to replace aging underground infrastructure that has exceeded its expected lifecycle. This letter provides important information about the project, what to expect during construction, and how to stay informed.
Proposed work details:
- Water service replacement to property line
- Replacing the sanitary sewer
- Replacing the storm sewer
- Partial replacement of existing private drain connections (PDC)
- Replacing sidewalks
- Concrete curb and gutter installation
- New asphalt road surface
- Tree removals

Pre-construction survey
If you have not completed the pre-construction survey already, we would appreciate you taking the time to fill out the questionnaire sent with the previous communication, to share any feedback you might have related to flooding, water supply, traffic, or any other neighbourhood considerations.
Transportation impacts
The City has evaluated how pedestrians, motorists, and cyclists will be impacted by the construction of this project. We have determined that Paul Street will remain open to local vehicle traffic only. There will be a few possible disruptions to driveway access at different points in the project. Residents who require accommodation (level entry, advanced notice, etc.) should contact the Project Manager to arrange for access during the construction period. Cyclists and pedestrians should exercise caution around construction sites and follow all construction signs. A Construction Notice will be issued before construction begins with additional information.
If you require any special accommodation in accessing the project information or online material, please contact the City project manager listed, and we will work together to best share the information with you. If you have specific questions about potential impacts to your property, please contact the City project manager listed.