Hansuld Street and Dale Street Infrastructure Renewal Project
Share Hansuld Street and Dale Street Infrastructure Renewal Project on FacebookShare Hansuld Street and Dale Street Infrastructure Renewal Project on TwitterShare Hansuld Street and Dale Street Infrastructure Renewal Project on LinkedinEmail Hansuld Street and Dale Street Infrastructure Renewal Project link
About this project
The City of London is planning a construction project in the area of Hansuld Street and Dale Street to replace aging infrastructure that has exceeded its expected lifecycle.
This project includes:
Watermain replacement
Water Service replacement to property line
Sanitary sewer replacement
Storm sewer replacement
Partial replacement of existing private drain connections
Tree removals
New asphalt road surface
Construction is expected to start in spring 2022 and is anticipated to last until fall 2022 with some minor clean-up work in spring/summer of 2023.
PROJECT DESIGN UPDATE
Please note the initial proposed design of the Hansuld Street and Dale Street infrastructure renewal project has been updated to remove the sidewalk as part of the project. The removal of the sidewalk from the design will result in fewer tree removals. Please refer to the following tree removal list:
Updated tree removal list
This table is an update to the one provided within Presentation 3 - Tree Impacts and Protection.
Location
Species
Trunk diameter
Reason
1705 Hansuld St
Basswood
20- 120 mm
Tree health and construction - conflict with watermain line
1653 Hansuld St
Blue Spruce
120 mm
Construction - conflict with water service and poor location
1652 Hansuld St
Autumn Blaze Maple
290 mm
Tree health and construction - conflict with water service
1678 Hansuld St
Green Spruce
430 mm
Construction - tree may need to be removed depending on grading and watermain installation. Need for tree removal to be confirmed during construction.
Surface reconstruction and tree assessment report maps are available upon request. Please contact the Project Manager.
Above: The above map shows the project limits. Work is planned on Hansuld Street, from Second Street to Dale Street, and on Dale Street, from Second Street to Hansuld Street.
Ongoing public engagement
The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation has been split into three parts and can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentation."
It's also possible to access the PowerPoint presentation used during the PUM on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides."
You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting:
Project Lead
Name: Dave Chromczak Organization: City of London Phone: 519-661-2489 x 8439 E-mail: dchromcz@london.ca
About this project
The City of London is planning a construction project in the area of Hansuld Street and Dale Street to replace aging infrastructure that has exceeded its expected lifecycle.
This project includes:
Watermain replacement
Water Service replacement to property line
Sanitary sewer replacement
Storm sewer replacement
Partial replacement of existing private drain connections
Tree removals
New asphalt road surface
Construction is expected to start in spring 2022 and is anticipated to last until fall 2022 with some minor clean-up work in spring/summer of 2023.
PROJECT DESIGN UPDATE
Please note the initial proposed design of the Hansuld Street and Dale Street infrastructure renewal project has been updated to remove the sidewalk as part of the project. The removal of the sidewalk from the design will result in fewer tree removals. Please refer to the following tree removal list:
Updated tree removal list
This table is an update to the one provided within Presentation 3 - Tree Impacts and Protection.
Location
Species
Trunk diameter
Reason
1705 Hansuld St
Basswood
20- 120 mm
Tree health and construction - conflict with watermain line
1653 Hansuld St
Blue Spruce
120 mm
Construction - conflict with water service and poor location
1652 Hansuld St
Autumn Blaze Maple
290 mm
Tree health and construction - conflict with water service
1678 Hansuld St
Green Spruce
430 mm
Construction - tree may need to be removed depending on grading and watermain installation. Need for tree removal to be confirmed during construction.
Surface reconstruction and tree assessment report maps are available upon request. Please contact the Project Manager.
Above: The above map shows the project limits. Work is planned on Hansuld Street, from Second Street to Dale Street, and on Dale Street, from Second Street to Hansuld Street.
Ongoing public engagement
The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation has been split into three parts and can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentation."
It's also possible to access the PowerPoint presentation used during the PUM on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides."
You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting:
Project Lead
Name: Dave Chromczak Organization: City of London Phone: 519-661-2489 x 8439 E-mail: dchromcz@london.ca