Proposed Environmental Assessment Study Report

The City has completed the Proposed Environmental Assessment Study Report (EASR) of the proposed expansion of the W12A Landfill site. The City is formally submitting the Proposed Environmental Assessment to the Ministry of the Environment, Conservation and Parks (MECP) for review and approval. The MECP will provide opportunities for comments from stakeholders after the submission of the final EASR from February 4 to March 25, 2022.

The Proposed EASR documents all aspects of the Environmental Assessment and consists of:

Volume Documents

Volume 1
(EASR)

Proposed Environmental Assessment of the Proposed W12A Landfill Expansion, City of London

Volume 2
(Approved Amended Terms of Reference)

Proposed Amended Terms of Reference Environmental Assessment of the Proposed W12A Landfill Expansion, City of London
Volume 3

(Technical Work Plans and Waste Quantity Projections)

Atmosphere Work Plan – Revision 2
Groundwater Work Plan
Surface Water Work Plan
Biology Work Plan
2019 Updated Residual Waste Projections and Landfill Capacity Assessment

Volume 4
(Existing Conditions and Impact Assessment Reports)

Air Quality Existing Conditions and Impact Assessment Report
Noise Existing Conditions and Impact Assessment Report
Groundwater Existing Conditions and Impact Assessment Report
Surface Water Existing Conditions and Impact Assessment Report
Biology (Aquatic and Terrestrial Ecosystems) Existing Conditions and Impact Assessment Report
Land Use Existing Conditions and Impact Assessment Report
Agricultural Existing Conditions and Impact Assessment Report
Archaeological Existing Conditions and Impact Assessment Report
Heritage Existing Conditions and Impact Assessment Report
Socio-economic Existing Conditions and Impact Assessment Report
Visual Existing Conditions and Impact Assessment Report
Traffic Assessment in Support of the Environmental Assessment
Design and Operations Existing Conditions and Impact Assessment Report

Volume 5
(Consultation Report)
Consultation Log


If you have any questions, please do not hesitate to contact Jay Stanford (jstanfor@london.ca(External link), 519.661.CITY (2489) ext. 5411) or Mike Losee (mlosee@london.ca(External link), 519.661.CITY (2489) ext. 7369).

Share Proposed Environmental Assessment Study Report on Facebook Share Proposed Environmental Assessment Study Report on Twitter Share Proposed Environmental Assessment Study Report on Linkedin Email Proposed Environmental Assessment Study Report link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>