The City will be reconstructing Talbot Street, from Huron Street to Victoria Street, to replace and improve the quality and reliability of water, sewer and road infrastructure.

This project will include:

  • Watermain replacement including water service renewal to the property line
  • Storm and sanitary sewer replacement
  • Partial replacement of existing private drain connections
  • Renewal of existing sidewalk where required
  • New concrete curb and gutter
  • New asphalt road surface

Construction is expected to start in spring 2021 and is anticipated to last until fall 2021 with some minor clean-up work in 2022.

The City of London will reconstruct Talbot Street, from Huron Street to Victoria Street. For more information, please contact Dave Chromczak at dchromcz@london.ca or by calling 519-661-2489 x 8439


Above: The above map shows the project limits. The City of London will reconstruct Talbot Street, from Huron Street to Victoria Street.


Ongoing public engagement

The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation has been split into three parts and can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentation."

It's also possible to access the PowerPoint presentation used during the PUM on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides."

You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting:

Dave Chromczak

Technologist II

dchromcz@london.ca

519-661-2489 x 8439

Graphic of construction worker walking down residential street

About this project

The City will be reconstructing Talbot Street, from Huron Street to Victoria Street, to replace and improve the quality and reliability of water, sewer and road infrastructure.

This project will include:

  • Watermain replacement including water service renewal to the property line
  • Storm and sanitary sewer replacement
  • Partial replacement of existing private drain connections
  • Renewal of existing sidewalk where required
  • New concrete curb and gutter
  • New asphalt road surface

Construction is expected to start in spring 2021 and is anticipated to last until fall 2021 with some minor clean-up work in 2022.

The City of London will reconstruct Talbot Street, from Huron Street to Victoria Street. For more information, please contact Dave Chromczak at dchromcz@london.ca or by calling 519-661-2489 x 8439


Above: The above map shows the project limits. The City of London will reconstruct Talbot Street, from Huron Street to Victoria Street.


Ongoing public engagement

The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation has been split into three parts and can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentation."

It's also possible to access the PowerPoint presentation used during the PUM on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides."

You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting:

Dave Chromczak

Technologist II

dchromcz@london.ca

519-661-2489 x 8439

Do you have a question for the project team?

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.