Regent Street and William Street Infrastructure Renewal Project

Share Regent Street and William Street Infrastructure Renewal Project on Facebook Share Regent Street and William Street Infrastructure Renewal Project on Twitter Share Regent Street and William Street Infrastructure Renewal Project on Linkedin Email Regent Street and William Street Infrastructure Renewal Project link

Graphic of construction worker walking down residential street

About this project

The City of London is planning a construction project in the area of Regent Street and William Street to replace aging infrastructure that has exceeded its expected lifecycle.

This project includes:

  • Watermain replacement
  • Water service replacement to property line
  • Sanitary sewer replacement
  • Storm sewer replacement
  • Partial replacement of existing private drain connections
  • Reconstruction of multi-use-path and storm channel outfall along the south limit of the Huron Street Woods
  • Tree removals
  • New bike lanes on William Street from Regent Street to Huron Street
  • Replacement of sidewalk and concrete curb and gutter
  • New sidewalk on the south boulevard of Regent Street between Maitland Street and Harrison Avenue
  • New asphalt road surface

Above: The above map shows the project limits. Work is planned on Regent Street, from Maitland Street to William Street, and on William Street, from Regent Street to Huron Street.


Project Update Meeting

While the latest project information would typically be presented at an in-person project update meeting, adjustments are being made to ensure public safety and to follow COVID-19 restrictions on public gatherings. Please visit the project website listed below to view the latest project information and documents. The website contains several short videos to help explain the details of the project. If you require any special accommodation in accessing the project information or online material, please contact the City project manager listed below, and we will work together to best share the information with you. If you have specific questions about potential impacts to your property, please contact the City project manager listed below.


Transportation Impacts

The City has evaluated how pedestrians, motorists, cyclists and transit users will be impacted by the construction of this project. We have determined that the project will consist of a full road closure with intermittent sidewalk closures. Access to local businesses and residences will be maintained. A Construction Notice (letter 3) will be issued two weeks before construction starts with additional information.

Project Lead

Name: George Negas
Organization: City of London
Phone: 519-661-2489 x 5805
E-mail:
gnegas@london.ca

After hours or urgent matters

Name: Dispatch
Organization: City of London
Phone: 519-661-4965
E-mail: es@london.ca

Graphic of construction worker walking down residential street

About this project

The City of London is planning a construction project in the area of Regent Street and William Street to replace aging infrastructure that has exceeded its expected lifecycle.

This project includes:

  • Watermain replacement
  • Water service replacement to property line
  • Sanitary sewer replacement
  • Storm sewer replacement
  • Partial replacement of existing private drain connections
  • Reconstruction of multi-use-path and storm channel outfall along the south limit of the Huron Street Woods
  • Tree removals
  • New bike lanes on William Street from Regent Street to Huron Street
  • Replacement of sidewalk and concrete curb and gutter
  • New sidewalk on the south boulevard of Regent Street between Maitland Street and Harrison Avenue
  • New asphalt road surface

Above: The above map shows the project limits. Work is planned on Regent Street, from Maitland Street to William Street, and on William Street, from Regent Street to Huron Street.


Project Update Meeting

While the latest project information would typically be presented at an in-person project update meeting, adjustments are being made to ensure public safety and to follow COVID-19 restrictions on public gatherings. Please visit the project website listed below to view the latest project information and documents. The website contains several short videos to help explain the details of the project. If you require any special accommodation in accessing the project information or online material, please contact the City project manager listed below, and we will work together to best share the information with you. If you have specific questions about potential impacts to your property, please contact the City project manager listed below.


Transportation Impacts

The City has evaluated how pedestrians, motorists, cyclists and transit users will be impacted by the construction of this project. We have determined that the project will consist of a full road closure with intermittent sidewalk closures. Access to local businesses and residences will be maintained. A Construction Notice (letter 3) will be issued two weeks before construction starts with additional information.

Project Lead

Name: George Negas
Organization: City of London
Phone: 519-661-2489 x 5805
E-mail:
gnegas@london.ca

After hours or urgent matters

Name: Dispatch
Organization: City of London
Phone: 519-661-4965
E-mail: es@london.ca

Page last updated: 22 Dec 2021, 03:38 PM