What is a Complete Corridor?

An overarching concept of the EA is to create a naturalized corridor within South London as part of the stormwater management strategy. As such, the study includes looking at the option of creating a “complete corridor” to convey water, wildlife and people.

The three components of the complete corridor include:

  • The Dingman Creek – to convey water and provide habitat for aquatic life;
  • The Floodplain Corridor – to consider expanded storage within the existing floodplain and connect significant Natural Heritage System features.
  • A Pedestrian Pathway – to encourage physical activity, including walking, running, and cycling.

The complete corridor is intended to be a unique feature for South London with limits expected to be between Wonderland Road South and Wellington Road South.

Share on Facebook Share on Twitter Share on Linkedin Email this link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>