What is a Complete Corridor?
An overarching concept of the EA is to create a naturalized corridor within South London as part of the stormwater management strategy. As such, the study includes looking at the option of creating a “complete corridor” to convey water, wildlife and people.
The three components of the complete corridor include:
- The Dingman Creek – to convey water and provide habitat for aquatic life;
- The Floodplain Corridor – to consider expanded storage within the existing floodplain and connect significant Natural Heritage System features.
- A Pedestrian Pathway – to encourage physical activity, including walking, running, and cycling.
The complete corridor is intended to be a unique feature for South London with limits expected to be between Wonderland Road South and Wellington Road South.
Share What is a Complete Corridor? on Facebook
Share What is a Complete Corridor? on Twitter
Share What is a Complete Corridor? on Linkedin
Email What is a Complete Corridor? link