Manitoba Street and Churchill Avenue Infrastructure Renewal Project

Share Manitoba Street and Churchill Avenue Infrastructure Renewal Project on Facebook Share Manitoba Street and Churchill Avenue Infrastructure Renewal Project on Twitter Share Manitoba Street and Churchill Avenue Infrastructure Renewal Project on Linkedin Email Manitoba Street and Churchill Avenue Infrastructure Renewal Project link

Graphic of construction worker walking down residential street

About this project

The City of London is planning a construction project in the area of Manitoba Street and Churchill Avenue to replace aging infrastructure that has exceeded its expected lifecycle.

This project includes:

  • Watermain replacement
  • Water service replacement to property line
  • Sanitary sewer replacement
  • Storm sewer replacement
  • Partial replacement of existing private drain connections (PDCs)
  • Tree removals
  • New concrete curb and gutter on Manitoba Street and Churchill Avenue
  • Sidewalk replacement
  • New sidewalk installation on North side of Churchill Avenue
  • Concrete curb replacement on Churchill Avenue
  • New asphalt road surface

Construction is expected to start in spring 2022 and is anticipated to last until fall 2022 with some minor clean-up work in spring/summer of 2023.

Surface reconstruction and tree assessment report maps are available upon request. Please contact the Project Manager.

Above: The map shows the project limits. Work is planned on Manitoba Street from Dundas Street to Churchill Avenue and Churchill Avenue from Spruce Street to Vancouver Street.


Ongoing public engagement

The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation has been split into three parts and can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentations".

It's also possible to access the PUM PowerPoint presentations on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides".

You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting:

Project Lead

Name: Crystal McQuinn
Organization: City of London
Phone: 519-661-2489 x 4472
E-mail: cmcquinn@london.ca


Graphic of construction worker walking down residential street

About this project

The City of London is planning a construction project in the area of Manitoba Street and Churchill Avenue to replace aging infrastructure that has exceeded its expected lifecycle.

This project includes:

  • Watermain replacement
  • Water service replacement to property line
  • Sanitary sewer replacement
  • Storm sewer replacement
  • Partial replacement of existing private drain connections (PDCs)
  • Tree removals
  • New concrete curb and gutter on Manitoba Street and Churchill Avenue
  • Sidewalk replacement
  • New sidewalk installation on North side of Churchill Avenue
  • Concrete curb replacement on Churchill Avenue
  • New asphalt road surface

Construction is expected to start in spring 2022 and is anticipated to last until fall 2022 with some minor clean-up work in spring/summer of 2023.

Surface reconstruction and tree assessment report maps are available upon request. Please contact the Project Manager.

Above: The map shows the project limits. Work is planned on Manitoba Street from Dundas Street to Churchill Avenue and Churchill Avenue from Spruce Street to Vancouver Street.


Ongoing public engagement

The project team has recorded a narrated Project Update Meeting (PUM) for residents to learn about project details and impacts. The video presentation has been split into three parts and can be accessed on the right-hand side of the page under "Project Update Meeting - Narrated Presentations".

It's also possible to access the PUM PowerPoint presentations on the right-hand side of the page under "Project Update Meeting - PowerPoint Slides".

You can leave any questions or comments below. Also, please don't hesitate to contact the project manager if you have any questions about the information in the Project Update Meeting:

Project Lead

Name: Crystal McQuinn
Organization: City of London
Phone: 519-661-2489 x 4472
E-mail: cmcquinn@london.ca


Page published: 28 Jan 2022, 01:34 PM