Burlington Street and Paymaster Avenue Reconstruction

Share on Facebook Share on Twitter Share on Linkedin Email this link

The public engagement opportunity for this project has ended. If you have any questions around construction, please contact Dave Chromczak at dchromcz@london.ca or by phone at 519-661-2489 x 8439.

Graphic of construction worker walking down residential street

About this project

The City is reconstructing Burlington Street, from Scenic Drive to Burlington Crescent; and Paymaster Avenue in its entirety to replace and improve the quality and reliability of water, sewer and road infrastructure.

Proposed Work Details:

  • Watermain replacement including water service renewal to the property line
  • Storm and sanitary sewer replacement
  • Partial replacement of existing private drain connections
  • New sidewalk installation on Paymaster Avenue and replacement of existing sidewalk on Burlington Street
  • Concrete curb and gutter replacement
  • New asphalt road surface.

Construction started in April 2021 and is anticipated to last until fall 2021 with some minor clean-up work in 2022.


Above: The above map shows the project limits. The City of London will reconstruct Burlington Street from Scenic Drive to Burlington Crescent and Paymaster Avenue in its entirety.

Graphic of construction worker walking down residential street

About this project

The City is reconstructing Burlington Street, from Scenic Drive to Burlington Crescent; and Paymaster Avenue in its entirety to replace and improve the quality and reliability of water, sewer and road infrastructure.

Proposed Work Details:

  • Watermain replacement including water service renewal to the property line
  • Storm and sanitary sewer replacement
  • Partial replacement of existing private drain connections
  • New sidewalk installation on Paymaster Avenue and replacement of existing sidewalk on Burlington Street
  • Concrete curb and gutter replacement
  • New asphalt road surface.

Construction started in April 2021 and is anticipated to last until fall 2021 with some minor clean-up work in 2022.


Above: The above map shows the project limits. The City of London will reconstruct Burlington Street from Scenic Drive to Burlington Crescent and Paymaster Avenue in its entirety.